The final woodchip cars are spotted at the receiver. The mill will be idled indefinitely once the softwood chip pile to the right is emptied. This is expected to be within a few days. The CAT D7 c... (more)
After scaling nine loaded chip cars (avg @ 85000KG's) we prepare to head down to spot for Northern Woodchip
The guys bring down 9 loads for Paul to unload, with another 4 in the afternoon. With the 13 chip cars, just shy of 100 semi trucks will deliver woodchips to the plant.
Cabshot of a MLW S13u
a beautiful day for switching operations at MPI, thats the tug Anglican Lady w/ barge PML 900 at the dock